Give a detailed description of all controls, Best Management Practices (BMPs) and
measures that will be implemented at the construction site for each activity identified in
the intended sequence of major soil disturbing activities section. Provide time frames in
which the controls will be implemented. NOTE: All controls shall be consistent with
performance standards for erosion and sediment control and stormwater treatment set
forth in s. 62-40.432, F.A.C., the applicable Stormwater or Environmental Resource
Permitting requirements of the Department or a Water Management District, and the
guidelines contained in the Florida Development Manual: A Guide to Sound Land and
Water Management (DEP, 1988) and any subsequent amendments.
Describe all temporary and permanent stabilization practices. Stabilization practices
include temporary seeding, mulching, permanent seeding, geotextiles, sod stabilization,
vegetative buffer strips, protection of trees, vegetative preservations, etc.
Describe all structural controls to be implemented to divert stormwater flow from
exposed soils and structural practices to store flows, retain sediment on-site or in any
other way limit stormwater runoff. These controls include silt fences, earth dikes,
diversions, swales, sediment traps, check dams, subsurface drains, pipe slope drains, level
spreaders, storm drain inlet protection, rock outlet protection, reinforced soil retaining
systems, gabions, coagulating agents and temporary or permanent sediment basins.